Case study · ERP and migration
Two legacy systems become one leading system
Rental, workshop and finance of a vehicle rental company move to one system on a single cutover date, measured by contacts, vehicles, contracts and invoice amounts.
- In production since August 2026
- Figures from the measurement two days before go-live
Starting point
Two legacy systems, one cutover date
A vehicle rental company with its own workshop kept customers, vehicles, rental contracts and documents in two separate legacy systems. Both were to be replaced on a single cutover date by one leading system.
What mattered was that every amount still added up after the move.
- Rental, workshop and finance in one system
- Both legacy systems keep growing until the start
- Migrated documents must match the original
Approach
Measure, migrate, cross-check
Result
What the measurement showed
For all 1,192 invoices that existed in the old billing system and in the new system, not a single amount deviated by even one cent.
The measurement also named open work: the payment status of incoming invoices, a column offset when reading one legacy system, and the invoices of the current month. After the start, further operational faults surfaced, including an outgoing mail queue that had not worked since late July.
- No orphaned origin marker in the stock
- Customer notes migrated at 98.2 percent
- Document corrections are additive, posted documents stay untouched
Questions and answers
About the cutover
Why do you count before the start?
Because only a measurement on both sides shows what is really missing.
How reliable are the amounts?
For the 1,192 invoices that existed in both worlds they match to the cent. For stock without a counterpart we check completeness and origin.